LGMG|MEWPS|Lingong Heavy Machinery Co.,Ltd.

AS0808E
  1. 10m
    Max. Working Height
  2. 230kg
    Platform Capacity
  3. 0.83m
    Machine Width
SR1218E
  1. 13.9m
    Max. Working Height
  2. 365kg
    Platform Capacity
  3. 1.79m
    Machine Width
AR16J
  1. 17.70m
    Max. Working Height
  2. 230kg
    Platform Capacity
  3. 2.31m
    Machine Width
T26J
  1. 27.9m
    Max. Working Height
  2. 340kg
    Platform Capacity
  3. 2.5m
    Machine Width
H1840
  1. 17.5m
    Max. Lifting Height
  2. 4000kg
    Max. Capacity
  3. 2.44m
    Machine Width
AS0808E
  1. 10m
    Max. Working Height
  2. 230kg
    Platform Capacity
  3. 0.83m
    Machine Width
SR1218E
  1. 13.9m
    Max. Working Height
  2. 365kg
    Platform Capacity
  3. 1.79m
    Machine Width
AR16J
  1. 17.70m
    Max. Working Height
  2. 230kg
    Platform Capacity
  3. 2.31m
    Machine Width
T26J
  1. 27.9m
    Max. Working Height
  2. 340kg
    Platform Capacity
  3. 2.5m
    Machine Width
H1840
  1. 17.5m
    Max. Lifting Height
  2. 4000kg
    Max. Capacity
  3. 2.44m
    Machine Width
Contact Us

online message

If you are interested in our machine platforms or have any questions about how they work, then please get in touch using the following contact form.

News
News
How to efficiently and quickly break the pile head?
Time:2023-03-23 14:10:53 Font size

1. Construction conditions:

The demolition of the reinforced reinforced concrete piers is surrounded by residential areas, and the use of explosives is prohibited. At the same time, construction requirements do not allow the vibration and impact generated by blasting to affect the living environment of residents, so breaking hammers cannot be used. The diameter of the reinforced concrete pier is 1.5 meters and the height is 4 meters. It is required to remove all the mounds and remove all the steel bars at the same time.


210225112027146

210225112031113


2. Construction method:

1. Equipment configuration: hydraulic cracking machine with one machine and two guns, drilling machine, auxiliary tools shovel, crowbar, and sledgehammer. Scissors and so on.

2. Construction method: When drilling, drill holes perpendicular to the concrete pier. The hole diameter is 42mm, the hole depth is more than 50mm, and the hole distance is 60mm. You can drill holes in advance to improve work efficiency. When the cracking gun performs cracking operations in the hole, the concrete layer is peeled off and the fault surface is cracked. After one and two cracks, the entire concrete pier is completely removed to expose the steel bars, and finally the steel bars are cut off with scissors.


9


We use cookies to improve your browsing experience! By continuing to use this website, you agree to the terms outlined in our Privacy Policy, and to the receipt of targeted communications through our marketing platforms. We do not sell your personal information, and only obtain personal information with your consent. For more details, please refer to our Privacy Policy.
Yes, I agree
We use cookies to offer you a better browsing experience, analyze site traffic and Accept personalize content. By using this site, you agree to our use of cookies.
Yes, I agree